These are carried out to locate the alignment for Transmission lines, Pipelines, Cable Networking etc., The sectional profile with topographical information of the survey corridor helps the designers to design the route considering the practical feasibilities.
These are carried out to locate the alignment for Transmission lines, Pipelines, Cable Networking etc., The sectional profile with topographical information of the survey corridor helps the designers to design the route considering the practical feasibilities.
Land Contour Survey
Topographical Survey
These are carried out to determine the characteristics of the details found on the surface of the earth and based on these inputs topographics maps are prepared. These maps are used in the planning stages of projects to help to design the layout and locations of the buildings, roads etc..
These are carried out to find the difference in elevation in elevation of the existing ground. Contours are imaginary lines connecting the slopes of same height. The contour maps provide the condition of the existing terrain conditions, which helps the design team in deciding the proposed ground profile and in designing the drains.
Boundary Survey
Measured Building Surveys
These are carried out to reestablish and/or recover the property corners of a piece of property and accurately define the limits of the subject property.
These are carried out to prepare floor plans, elevations and sections of existing buildings to be provided for reconstruction projects, architectural, refurbishment or letting purposes and to resolve any sort of disputes with regard to area.
Setting-out Work
GPS Control Survey
These are carried out to mark the locations on the ground, as per the drawings. These services are used in both preconstruction and post-construction activities.
These are carried out to establish network of points called control points or control stations. These points can be used for the subsequent measurements that are to be recorded at the site. Establishing the control points calls for most precision, as this will have direct bearing on the accuracy of the final survey to be carried out at the project site.
Volume Calculation
These are carried to compute the volume of cutting and filling while analyzing a ground profile for proposed industrial complexes, buildings, roads, strengthening and widening of roads, leveling or excavating the existing ground to the required depth etc.